Concrete Surface Preparation & Waterproofing Removal
Balcony Surface Preparation for Waterproofing Reinstatement
CARE Construction was engaged by Advec Construction to prepare a residential balcony for waterproofing reinstatement as part of a remedial works program in Potts Point.

The Challenge
Removal of existing waterproofing membrane and surface coatings
Detailed edge grinding along walls, balustrades and difficult-to-access areas
Dust-controlled grinding operations within a residential environment
Fast turnaround to minimise delays to following trades
Surface preparation is one of the most critical stages of any waterproofing project. Any residual coating, paint or membrane can compromise adhesion and reduce the long-term performance of the new waterproofing system.
Our Solution
CARE deployed specialised concrete grinding equipment together with hand-held edge grinders to ensure complete preparation of the balcony surface.
Works included:
Mechanical removal of existing waterproofing materials
Surface grinding of the full balcony area
Detailed edge preparation and perimeter grinding
Dust extraction and controlled work practices
Final surface preparation ready for waterproofing reinstatement
The entire 12m² balcony was completed in less than one working day, allowing the builder to proceed immediately with the next stage of the remediation works.
Value Delivered
By providing a rapid response and efficient delivery, CARE helped Advec Construction minimise downtime between trades and maintain the project program.
Our combination of specialised grinding equipment, attention to detail, and experience in remedial construction ensured the balcony was left in the ideal condition for the application of a new waterproofing system.